§ 150.52 TIMING.
   A preliminary determination as to whether a property, structure, or area meets one or more of these criteria shall be made within 30 days of the filing of a nomination to the Commission.
(`79 Code § 150.192) (Ord. 94-378, passed 12-5-94)