The Building Commissioner may waive or modify the requirements of this chapter for plans, specifications, field observation testing and summary reports if the application for a permit or a certificate in writing of a geotechnical engineer states, to the satisfaction of the Commissioner, that the proposed excavation or fill:
(a) Will not interfere with adequate drainage for the site area and the drainage area of land tributary to the site;
(b) Will not obstruct, damage or adversely affect existing sewerage or drainage, public or private;
(c) Will not cause a stagnant pond of water to form;
(d) Will not create slope stability problems on subject and adjacent property;
(e) Will not cause detrimental erosion or sedimentation; or
(f) Is in an isolated, self-contained area and there is no apparent danger to adjacent public or private property.
(Ord. 95-28, passed 9-5-1995)