§ 50.093 ACCIDENTAL DISCHARGE AND SLUDGE CONTROL PLANS.
   (A)   At least once every two years, the POTW Director shall evaluate whether each significant industrial user needs an accidental discharge and sludge control plan. The POTW Director may require any user to develop, submit for approval and implement such a plan. Alternatively, the POTW Director may develop such a plan for any user.
   (B)   An accidental discharge and sludge control plan shall address, at a minimum, the following:
      (1)   Description of discharge practices, including non-routine batch discharges;
      (2)   Description of stored chemicals;
      (3)   Procedures for immediately notifying the POTW Director of any accidental or sludge discharge, as required by § 50.130 of this code; and
      (4)   Procedures to prevent adverse impact from any accidental or sludge discharge. These types of procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents and measures and equipment for emergency response.
(Prior Code, § 50.078) (Ord. O-00-001, passed 2-24-2000)