§ 50.029 EXCAVATION AND BACKFILL.
   All excavations required for the installation of a building sewer shall be open trench work, unless otherwise approved by the town. Backfill shall not be performed until the work has been inspected by the County Plumbing Inspector.
(Prior Code, § 50.024) (Ord. O-00-001, passed 2-24-2000) Penalty, see § 50.999