§ 50.129 CHANGED CONDITIONS; REPORT REQUIRED.
(A) Each user must notify the POTW Director of any planned significant changes to the user’s operations or system which might alter the nature, quality or volume of its wastewater at least 90 days before the change.
(B) (1) The POTW Director may require the user to submit information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under §§ 50.105 through 50.112 of this code. (2) The POTW Director may issue a wastewater discharge permit under §§ 50.105 through 50.112 of this code or modify an existing wastewater discharge permit under §§ 50.105 through 50.112 of this code in response to changed conditions or anticipated changed conditions. (3) For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20% or greater, and the discharge of any previously unreported pollutants.
(Prior Code, § 50.114) (Ord. O-00-001, passed 2-24-2000)