1109.04   INSPECTIONS.
   (a)   Schedule of Inspections. Streets shall be constructed in accordance with the approved plans and specifications on file with the County Engineer's Office as approved by the County Planning Commission. The Engineer's Department shall inspect all road construction three or four times prior to the completion and acceptance for maintenance. Also, the Engineer's Department shall have the authority to require core samples after construction is completed. County Engineer's Office shall be contacted to make periodic inspections as the contractor progresses, according to the following schedule:
      (1)   When the subgrading is completed.
      (2)   When the road base has been installed.
      (3)   When the paving and drainage have been completed. (The Township Trustees may accompany the Engineer on the third inspection.)
      (4)   Additional inspections shall be made to view corrections of deficiency found during the above inspections.
   (b)   Inspection Fees. A fee schedule shall be established by the County Engineer for ongoing inspection by his personnel. The ongoing inspection fee shall be fifteen dollars ($15.00) per trip. The developer shall make provisions for testing or certification of materials when the County Engineer so requires.
(Ord. 1164.  Passed 8-16-82.)