§ 304.11 TRENCHLESS EXCAVATION.
   As a condition of all applicable permits, permittees employing trenchless excavation methods, including but not limited to horizontal directional drilling, shall follow all requirements set forth in M.S. Ch. 216D, as it may be amended from time to time, and Minn. Rules Ch. 7560, and shall require potholing or open cutting over existing underground utilities before excavating as determined by the city.
(Ord. 09-08, passed 6-23-2008)