(A) Easements.
(1) Easements having a minimum width of ten feet shall be provided along the side or rear lot lines as required for utility lines and underground mains and cables.
(2) For lots abutting public right-of-way where the right-of-way width is less than the minimum width specified herein or in the Public Works Design Manual, an easement having a minimum width of ten feet shall be provided along the street side lot line.
(3) Utility easements shall connect with easements established in adjoining properties. All utility easements should be reviewed by the city Public Works Department. Where feasible, all utilities shall be placed underground.
(4) Where a subdivision is traversed by a water course, drainage way, channel or stream, there shall be provided a floodage easement or drainage right-of-way conforming substantially with the 100-year high water elevation of the water course.
(B) Pedestrian walkway easements with right-of-way of not less than ten feet in width for a sidewalk or 20 feet in width for a multi-use trail shall be required where deemed essential to provide circulation, or access to schools, playgrounds, shopping centers, transportation, and other community facilities as required by the City Council.
(Ord. 20220120-01, passed 1-20-22)