§ 152.04.43 PERMIT COMPLETION.
   Before work under the permit is deemed complete, the permittee must submit as-builts, a long term maintenance plan and information demonstrating that the stormwater facilities conform to design specifications. The city will verify that all design specifications have been met.
(Ord. 20220120-01, passed 1-20-22)