(A) Final site design and choice of permanent stormwater volume reduction practices shall be based on outcomes of the MIDS calculator (or other model that shows the performance goal can be met) and shall meet the performance goals of this Division. The MIDS calculator is available at: http://stormwater.pca.state.mn.us/index.php/Calculator.
(B) Rate control calculations shall be modeled in HydroCAD, SWMM, or equivalent as approved by the city.
(Ord. 20220120-01, passed 1-20-22)