§ 114.130  UNDERGROUNDING OF SYSTEM COMPONENTS.
   The undergrounding of a grantee’s distribution system shall be installed underground at a grantee’s cost where existing utilities are already underground. Previously installed aerial distribution systems shall be underground or relocated in concert, and on a cost-sharing basis, with other utilities, when such other utilities may convert from aerial to underground construction.
(2011 Code, § 14.20.060)  Penalty, see § 114.999