(A) The grantor may, at its sole option, apply any or all of the following remedies in connection with delays in system construction:
(1) Reduction in the duration of a franchise on a month-for-month basis for each month of delay exceeding three months;
(2) Forfeiture of bonds and/or assessment of monetary damages up to the maximum limit specified in a franchise agreement, levied against a security fund for delays exceeding six months; and
(3) Termination of a franchise awarded hereunder for delays exceeding 12 months.
(2011 Code, § 14.20.050)