§ 50.28 CONSTRUCTION AND INSPECTION IN COMPLIANCE WITH ISSUED CERTIFICATE OF COMPLIANCE.
   All construction, installation, or modification of any on-site wastewater treatment system shall be in accordance with the design and engineer report, South Dakota Codified Laws, Administrative Rules of South Dakota, and the design and engineer report. Inspections shall be conducted at least once by the applicant’s engineer during the construction of the on-site wastewater treatment system at such time as to ensure that the system has been constructed per submitted and approved design or acceptable changes. The installer hired by the applicant shall file a signed as-built, including photographs of the system prior to covering, with the Department when the installation of the system is complete. The as-built shall include a certified statement that the work was installed in accordance with the acceptable design and that it was free from defects. In order to aid in the location of below ground components, all new or replacement on-site wastewater treatment systems shall have a tracer wire system installed.
(Ord. 1206-23, passed 6-26-2012)