A certificate of compliance is not required for:
(A) Installation or repair of the solid sewer pipe from the building to the septic or holding tank, including sewer mains and collection systems installed in front of on-site wastewater treatment systems;
(B) Installation or repair of the solid sewer pipe from the septic tank to the first distribution or drop box;
(C) Repair or replacement of pumps, floats, or other electrical devices of the pump; or
(D) Repair or replacement of baffles in the septic tank.
(Ord. 1206-23, passed 6-26-2012)