§ 52.44 MODIFICATIONS OF WASTEWATER CONTRIBUTION PERMIT.
   The district may modify an industrial user permit for good cause, including, but not limited to, the following reasons:
   (A)   To incorporate any new or revised federal, state or local pretreatment standards or requirements;
   (B)   To address significant alterations or additions to the user’s operation, processes or wastewater volume or character since the time of the individual wastewater discharge permit issuance;
   (C)   A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
   (D)   Information indicating that the permitted discharge poses a threat to the Danville POTW, personnel, bio solids disposal and/or the receiving stream;
   (E)   Violation of any terms or conditions of the industrial user permit;
   (F)   Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;
   (G)   Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 C.F.R. § 403.13; or
   (H)   To correct typographical or other errors in the discharge permit.
(Ord. 01-07.28.16, passed 7-28-2016)