1022.02   CONSTRUCTION PERMITS.
   (A)   Permit Required. No person, directly or indirectly, as principal, agent or employee, shall construct, reconstruct or repair, or attempt to construct, reconstruct or repair, any sidewalk or curb in the City without first obtaining a permit therefor from the Engineer.
   (B)   Sidewalks.
      (1)   No sidewalk shall be constructed, reconstructed or repaired until a permit has been obtained from the Engineer either by the owner of the contiguous property or his agent. The application for a permit to construct, reconstruct or repair a sidewalk shall be on forms furnished by the Engineer. Such forms shall set forth the name and address of the owner of the property adjoining the right of way where the proposed work is to be done, the street address or lot number, the number of square feet of proposed sidewalk to be constructed, reconstructed or repaired, the width of the present sidewalk, the material in the present sidewalk, the material to be used in the proposed constructions reconstruction or repair and such other information as may be required. The permit shall be kept on the site of the construction, reconstruction or repair until completion of the work.
      (2)   The fee to be collected for the issuance of the sidewalk construction, reconstruction or repair permit required by this subsection shall be five dollars ($5.00). Such fee shall be payable at the office of the Engineer.
   (C)   Curbs.
      (1)   No curb shall be constructed, reconstructed or repaired until a permit has been obtained from the Engineer either by the owner of the contiguous property or his agent. The application for a permit to construct, reconstruct or repair a curb shall be on forms furnished by the Engineer. Such forms shall set forth the name and address of the owner of the property ad joining the right of way where the proposed work is to be done, the street address or lot number, the number of lineal feet of curbing to be constructed, reconstructed or repaired, the type of curbing, that is, monolithic, walltype or curb and gutter, and such other information as may be required. The permit shall be kept on the site of the construction, reconstruction or repair until the completion of the work.
      (2)   The fee to be collected for the issuance of the curb construction, reconstruction or repair permit required by this subsection shall be five dollars ($5.00). Such fee shall be payable at the office of the Engineer.
   (D)   Authority for Deposit of Materials. The issuance of a permit shall authorize the reasonable use of sidewalk or street space for the deposit of materials and equipment required for sidewalk construction, reconstruction or repair, subject to any rules or regulations of the Engineer governing such temporary deposits.
(Ord. 70-88. Passed 6-6-88.)