(A) Users that discharge wastewaters applicable to this chapter shall be subject to the review and approval of the town. Where necessary in the opinion of the town, the owner shall provide pretreatment
facilities necessary to reduce the objectionable characteristics or constituents to within maximum limits provided in this chapter, and provide control or flow equalization of such wastes so as to avoid any slug loads or excessive loads that may be harmful to the POTW.
(B) No new connection shall be made unless there is flow capacity available in all downstream sewers, lift stations, force mains and the POTW, including capacity for BOD and TSS.
(C) Surcharges shall be imposed by the POTW for any compatible pollutant discharged in excess of the limits set forth herein.
(Ord. 2019-10, passed 12-2-2019)