(a) Filing Fees. These shall be made payable to the Village.
(1) Minor subdivision.
(a) No plat required $ 25.00
(b) Plat review 100.00
(2) Major subdivision. At the time of submitting the application for preliminary plan approval and for each final plat approval, the subdivider shall deposit with the Village two hundred dollars ($200.00) plus ten dollars ($10.00) per lot towards the cost of the review and approval. If the cost exceeds the sum deposited, it shall be billed to the developer. If the cost is less than the sum deposited, the balance shall be refunded to the developer.
(3) Planned unit development. At the time of submitting an application for each preliminary development plan approval and for an application for final development plan approval, the developer shall deposit with the Village two hundred dollars ($200.00) plus ten dollars ($10.00) per lot towards the cost of review and approval. If the costs exceed the sum deposited, the additional amount shall be billed to the developer. If the cost is less than the amount deposited, the balance shall be refunded to the developer.
(b) Plan Review and Inspection Fees. Plans, quantities and an itemized cost estimate prepared by a professional engineer shall be submitted to the Village Engineer for review and approval of all street, storm sewer, outlet drainage, sanitary sewer and water line improvements. A certified check in the amount of one and one half percent (1-1/2%) of construction costs estimate shall be deposited with the Village to pay the costs of plan review and inspection of the construction to assure its conformance with the approved plans. The check shall be made out to the Village Finance Director. A record shall be kept of the actual costs incurred by the Village Engineer or his representatives for the inspection and shall be charged against the amount deposited. On completion of this project, any remaining money shall be returned to the developer. If repetitive reviews are required because of incomplete or inaccurate plan submission, the Village reserves the right to recover additional actual costs incurred.
(Ord. 81-56. Passed 12-28-81; Ord. 91-8. Passed 2-18-91.)
(c) Inadequate Deposit; Payment of Bill. In the event that the deposit described in subsection (B) is inadequate to reimburse the Village for the costs incurred in the plan review and inspection required by this chapter, then the Finance Director shall promptly bill the developer for the additional costs. If the bill is not paid within thirty days of the date mailed, there is hereby imposed a service charge of one and one half percent (1-1/2%) per month thereafter or one hundred dollars ($100.00) whichever is larger, which shall be added to subsequent bills and collected as otherwise provided by law. (Ord. 90-60. Passed 12-3-90.)