§ 152.077 EASEMENTS.
   (A)   Width and location. An easement for drainage and utilities at least ten feet wide shall be provided around the perimeter of a subdivision, along front lot lines and centered along shared side and rear lot lines. If necessary, for the extension of main water, sewer lines, similar utilities, or drainage purposes, or to incorporate wetlands easements of greater width or area may be required.
   (B)   Continuous utility easement locations. Drainage and utility easements shall connect with easements established in adjoining properties. These easements, when approved, shall not thereafter be changed without the approval of the City Council after a public hearing.
   (C)   Guy wires. Additional easements for pole guys should be provided, where appropriate, at the outside of turns. Where possible, lot lines shall be arranged to bisect the exterior angle so that pole guys fall alongside lot lines.
   (D)   Storm water management ponds. New storm water management ponds that are constructed as part of subdivisions shall be covered by drainage and utility easements that are dedicated to the city. At least one side of a pond should be located adjacent to public right-of-way and adequate easement dedicated to provide access for future maintenance.
(Ord. 582, passed 8-6-2019)