§ 151.025 INSPECTIONS AND PERMITS.
   (A)   The developer shall have a pre-construction meeting with the Zoning Administrator and his/her designated agents and the Town Engineer at least five days prior to the commencement of work within the development.
   (B)   The Town Engineer has the authority to require such testing as deemed necessary. Such testing shall be done by an independent source agreeable to the Engineer and shall be paid for by the subdivider or developer for all required review, inspection and/or testing or improvements. Testing may include but shall not be limited to: compaction of the existing subbase and subbase aggregate; concrete slump, air cylinder and beam tests; coreing for finished pavement and sidewalk depths; and asphalt content and mix gradation.
   (C)   All fees and costs of the Town Engineer in review of plats, plans, specifications, field inspections of improvements, and any other aspects of subdivision review, shall be paid by the subdivider or developer for all required review and testing of improvements before adoption by the town.
(Ord. passed - - )