11-13-3: ZONING COMPLIANCE PERMIT 1 :
   A.   Permit Required: No building or structure shall be erected, reconstructed, altered, enlarged, or moved 2 until a zoning compliance permit shall have been applied for in writing and issued by the zoning administrator.
   B.   Application For Permit: Every application for a zoning compliance permit submitted to the zoning administrator shall be accompanied by a site plan, drawn to scale and showing the lot and the building site and the location of existing buildings on the lot, vehicular and pedestrian ingress and egress, accurate dimensions of the lot, yards and building or buildings, together with such other information as may be necessary to the enforcement of this title.
   C.   Plan To Comply With Provisions: Before a zoning compliance permit is issued for the erection, reconstruction, alteration, enlargement or moving of any building or structure, the plans and intended use shall indicate conformity in all respects to the provisions of this title.
   D.   Expiration Of Permit: Any zoning compliance permit issued hereunder is valid for one year from the date of issuance. If the building or structure is not completed within that one year period, the zoning compliance permit expires and application for a new zoning compliance permit must be made.
   E.   Permit To Be Posted: The permit shall be posted in a prominent place on the premises prior to and during the period of erection, reconstruction, alteration, enlargement or moving.
   F.   Minimum Requirements: In interpreting and applying the provisions of this title, such provisions shall be held to be the minimum requirements for the promotion of health, safety, morals, convenience and the general welfare of the public. (Ord. 21-04, 10-5-2004)

 

Notes

1
1. See subsection 10-3-1C of this code for fees.
2
2. See also section 10-5-1 of this code.