(A) Any lot under 40 acres must be platted before a building permit can be issued.
(B) A building permit shall be issued for only one single-family dwelling or multifamily dwelling per lot. However, in no case shall the allowable density of any given zoning district be exceeded by such action.
(C) Buildings permits shall be required for all new construction, additions to structures, decks, replacement of decks, and moving of any buildings, to include mobile homes.
(D) Dirt work may be started prior to issuance of a building permit, but no concrete forms may be set without a building permit.
(E) All new driveways, approaches, or access points from a county or state road are required to have a permit from the appropriate county or state departments prior to issuance of a building permit.
(F) Fees. Upon the filing of any application for building permit, the applicant shall pay the county the appropriate fees as designated in Chapter 21 of this zoning title. These fees shall be utilized to help defray necessary administrative costs of processing the applications as required.
(G) Other pertinent information, as required, to include, but not be limited to, e.g., outside engineer/plan/inspector review of all plans and drawings; wetland information, streams, geotechnical information, on-site wastewater disposal systems, percolation tests, soil profiles, and the like, solely at the owner’s expense.
(Ord. 14-01, passed 6-6-2014, Ch. 13, Art. 1; Ord. 22-04, passed 4-11-2023)