§ II-9.009  SEPTIC SYSTEM POST INSTALLATION REPORT.
   The engineer shall supervise or perform an on-site inspection of the system to ensure the system was built substantially in the same manner as it was designed, and complete the report on a form provided by the Administrator. The report and photographs from the engineer inspecting the system shall be provided to the administrative official for inclusion in the applicant’s building permit file and for closure of the sewage permit file. There should also be an exhibit with location ties from prominent landmarks (structure, mature trees, property corners, and the like) to the center of the tank and corner of the drain field. The septic system post installation report shall be due in the office of Planning and Zoning no later than 30 days after the engineer inspects the system.
(Ord. 14-01, passed 6-6-2014, Ch. 9, § 1.9)