(A) Do not remove forms until concrete has hardened sufficiently to support its own weight and imposed construction loads.
(B) Remove forms in manner to avoid damage to concrete.
(C) Formwork for slabs and pavements, curbs and other parts not supporting vertical load of concrete may be removed as soon as concrete has hardened sufficiently to resist damage from removal operations, but in no case sooner than 12 hours.
(D) Remove wood forms from under floors, ramps, steps, and similar places (through temporary openings if necessary) so no material will be left to rot.
(Ord. 16-2020, passed 12-7-20)