§ 155.053 CONSTRUCTION JOINTS.
   Transverse bulkheads shall be placed at the end at each day’s pour or when production is interrupted for more than 30 minutes. These joints are formed by using a two-inch minimum thickness wood bulkhead or equal with holes at raid-depth spaced at 12-inch intervals for the insertion of smooth dowel bars. These joints are tied joints and are not designed to permit movement. The dowels shall be thoroughly cleaned of oil or any other substance that would prevent a bond between steel and concrete.
(Ord. - -, passed - -03; Am. Ord. 16-2020, passed 12-7-20)