Storm water drainage systems, roadways and other drainage systems shall be designed to handle stormwater runoff as outlined herein.
(A) Frequency of rain event. | |
(1) Storm sewers, open ditches, driveway, culverts | 25-year frequency |
(2) Road culverts | 25-year frequency or meet INDOT requirements if necessary |
(3) Protection for buildings | 50-year frequency |
(B) Runoff. | |
(1) 25 acres or less | Rational method Q=CIA |
(2) 25 acres or more | S.C.S.-TR-55 or other method approved by the City Engineer |
(C) Overland flow time. | Use chart A |
(1) First pavement inlet | Minimum - 10 minutes |
(2) First ditch catch basin | Minimum - 10 minutes |
(D) Rainfall intensity. | Use chart B |
(E) Run-off coefficients.
Weighted averages shall be used to define run-off coefficient.
Type of area | Run-off coefficient |
Type of area | Run-off coefficient |
Business | 0.60 - 0.75 |
Residential - Single family | 0.40 - 0.50 |
Residential - Multi-Family | 0.60 - 0.75 |
Industrial - Light | 0.60 - 0.80 |
Industrial - Heavy | 0.70 - 0.90 |
Parks, Cemeteries | 0.25 - 0.40 |
Playgrounds | 0.30 - 0.45 |
Railroad Yard | 0.30 - 0.40 |
Woodland | 0.20 - 0.40 |
Grassland | 0.25 - 0.45 |
Cropland | 0.50 - 0.70 |
Pavement | 0.90 |
Roofs | 0.90 |
Lawns, Dense soil, Flat, 0-2% | 0.20 - 0.25 |
Lawns, Dense Soil, Avg. 6% or less | 0.25 - 0.35 |
Lawns, Dense Soil, Steep, Over 6% | 0.35 - 0.40 |
(Ord. - -, passed - -03; Am. Ord. 16-2020, passed 12-7-20)
Editor’s note:
Charts A and B can be found in Exhibit “A” attached to Ordinance 16-2020.