(A) Each user at the time he or she is connected with the waterworks system shall pay a charge to cover the cost of: excavating and tapping the main; furnishing and installing service pipe from the main to the lot line; furnishing and installing corporation and stop cocks; and furnishing and installing meter crock (if outside), yoke and meter. The charge for a 5/8-inch meter tap shall be $300.
(B) The charge for a tap larger than the 5/8-inch meter tap shall be the cost of labor, materials, power machinery, transportation, and overhead incurred for installing the tap, but shall not be less than the charge for the 5/8 inch meter tap.
(`94 Code, § 54.04) (Ord. 2-1980, passed 3-17-80; Am. Ord. 7-1980, passed 6-16-80)