§ 155.133 INSPECTION AND TESTING.
   (A)   The city will provide all testing but it is the contractor’s responsibility to schedule. Twenty- four-hour (minimum) advance notice is required.
   (B)   The city shall have the right to reject defective materials and/or workmanship. Material and/or workmanship not in conformance with the specifications will be considered defective.
   (C)   Rejected materials and/or workmanship, at no additional cost to the city, shall be satisfactorily corrected in place, or replaced with work conforming to the specifications, or subject to an appropriate adjustment in price.
(Ord. 16-2020, passed 12-7-20)