A. Service Area: The area serviced by the city shall be all that area included within the corporate limits of the city.
B. Connection To Water System Required: Every parcel of land or premises within the boundaries of the city improved by new construction for occupancy, or occupied or used by any person or persons as a dwelling, or for a commercial business, or which uses or consumes water in any manner and is located within one thousand feet (1,000') of a city water main line, shall be connected to the city water system. The owner or person in charge of such property shall make or cause to be made such connection within sixty (60) days after adoption hereof. All laying of pipe from the home or facilities to be served by the city mains shall be properly designed and constructed in conformity with requirements specified by the city, and shall be paid for by the applicant. The customer shall be responsible for payment of all costs for material and labor in installing his service line from the service connection at the water main to his premises and thereon, except for the first thirty feet (30') of said service line which shall be paid for by the city if the service line is located within a city right of way. Any owner of property required to connect to the city water system under this section shall cause the city water main to be extended to his property line at his own cost and expense. (Ord. 2004-3, 9-23-2004)