If initiated by a property owner(s), the draft specific plan shall be processed in the same manner as required for General Plans by State law, and as follows.
A. Director’s Evaluation.
1. After the filing of a draft specific plan, the Director shall review the draft specific plan to determine whether it is in compliance with the provisions of this Chapter.
2. If the draft specific plan is not in compliance, it shall be returned to the applicant with written specification(s) as to why it does not comply, and with suggested revisions to ensure compliance.
B. Environmental Review Required. The draft specific plan shall be subject to environmental review as identified in Section 10.82.090 (Environmental Review).
C. Staff Report. A written staff report shall be prepared for the draft specific plan that shall include detailed recommendations and, if appropriate, suggested changes to the text and/or diagrams of the specific plan, as determined to be necessary to make it acceptable for adoption. (Ord. 935 § 3 (part), 2015)