(a) Final tract maps and parcel maps shall show the name of each highway or street, other than a future street, appearing on the map. Street and highway names shall be shown in or arrowed to the right-of-way.
(b) If only a portion of a street or highway is to be dedicated on a final map, the street or highway name shall be shown or arrowed into both the portion to be dedicated and the existing portion of the street or highway.
(c) Street and highway names shall be subject to the approval of the city engineer.
(d) The word “Avenue,” “Street,” “Place” or other street or highway designation shall be spelled out in full.
(Ord. 537 § 2 (part), 1985)