(a) Final tract maps and parcel maps shall be prepared in accordance with the requirements of the State Subdivision Map Act and of this title.
(b) Final tract maps and parcel maps shall be prepared by or under the direction of a registered civil engineer authorized to practice land surveying or a licensed land surveyor.
(c) The division of parcels, or portions thereof, which are not abutting shall be divided as a separate parcel and shown on separate maps, unless such parcels are separated because of the interposition of a highway, street, alley or railroad, public utility or flood-control right-of-way.
(Ord. 537 § 2 (part), 1985)