1113.06 APPLICATION FOR PRELIMINARY DEVELOPMENT PLAN (PUD).
   (a)   Name, address, and phone number of applicant.
   (b)   Legal description of property, including tax parcel I.D. number.
   (c)   Description of existing use.
   (d)   Present and proposed zoning districts.
   (e)   A vicinity map at a suitable scale, showing property lines, streets, existing and proposed zoning for all property adjacent to and within 200 feet from the proposed site along with any wellhead protection or historic district boundaries.
   (f)   A list of all property owners contiguous to, and directly across the street from the parcel(s) proposed to be rezoned, and their address as appearing on the Fairfield County Auditor’s current tax list.
   (g)   Proposed schedule for the development of the site, including any phasing.
   (h)   Evidence that the applicant has sufficient control over the land in question to effectuate the proposed development plan.
   (i)   A Preliminary Development Plan drawn to scale, prepared by a registered architect, registered engineer and/or registered landscape architect. Such plan shall contain the following information at a minimum.
      (1)   Selected uses by area or specific building location, allocation of land use by type as measured in acres, adjacent existing land use, right-of-way, and relationship to adjacent land use.
      (2)   General location of thoroughfares, including type, as well as location and size measured in number of parking spaces for all off-street parking areas, including curb cuts, drive aisles, loading spaces, and handicap ramps.
      (3)   Open spaces and the intended use therein and acreage provided.
      (4)   Residential land uses summarized by lot size, dwelling type and density.
      (5)   Existing and proposed roads, buildings, utilities, permanent facilities, easements, rights-of-way and abutting property boundaries.
      (6)   Physical features and natural conditions of the site including soils, the location of vegetation and existing tree lines.
      (7)   Surface drainage and areas subject to flooding.
      (8)   Preliminary plan for water, sewer, storm drainage and other utility systems.
      (9)   Sidewalks including handicap ramps.
      (10)   All building setbacks and required buffer and screening areas.
      (11)   All dumpster locations.
      (12)   Sign locations and sizes.
      (13)   Other information required for evaluation of proposal.
         (Ord. 5-01. Passed 2-26-01.)