1112.02 DETERMINATION OF AVERAGE SLOPE.
   The average slope for any hillside development shall be determined by the Lancaster Planning Commission during the time of preliminary plan design. Determination will be on an area by area basis with each lot sized according to the average topographic change falling within each area.
(Ord. 65-04. Passed 11-8-04.)