902.03 HAUL ROUTES.
   The permit holder shall at the time of filing a permit to excavate in the Right-of-Way or use the Right-of Way as a haul route shall submit a haul route map/plan for approval. A haul route shall be identified for the delivery or removal of building site materials as well as oversized equipment requiring special transport for a project. All approved maps/plan shall show ingress and egress of the excavation site both loaded and unloaded. The person or contractor that has been issued a permit shall be responsible for any excessive degradation or injury due to activities as described in the permit. Said repairs to the Right-of-Way shall be made in accordance with Section 901.04 and at the expense of the permittee.
(Ord. 8-13. Passed 4-8-13; Ord. 13-19. Passed 9-9-19.)