11-17-25: BUILDING RELOCATION/MOVING:
   A.   Compliance Required: Such activity shall comply with title 9, chapter 2 of this code.
   B.   Dwellings: The relocation of a building previously occupied as a dwelling to any parcel within the city shall comply with the following requirements:
      1.   Moving a dwelling onto a parcel within the permanent rural area or urban reserve area, as defined by the comprehensive plan, shall require approval of an administrative permit in compliance with chapter 8 of this title, provided that:
         a.   The use is allowed in the respective zoning district that includes the lot or parcel to which the dwelling is to be relocated.
         b.   The lot or parcel to which the dwelling is to be relocated shall be at least ten (10) acres in area.
      2.   Moving a dwelling onto a lot within the MUSA or MUSA expansion areas, or to a lot in the permanent rural or urban reserve area not meeting the criteria of subsection B1 of this section shall require approval of a conditional use permit in compliance with chapter 4 of this title, provided that the building maintains architectural and aesthetic compatibility with surrounding properties based upon, but not limited to, the following factors:
         a.   Building massing, height, and floor area.
         b.   The type, grade and quality of exterior building finish.
         c.   The dwelling is to receive an occupancy permit from the city building official within six (6) months from the date the conditional use permit is issued. (Ord. 730, sec. 11, 3-17-2003)