10-5-3: STREET IMPROVEMENTS:
   A.   The full width of the right of way shall be graded in accordance with the provisions for construction as outlined in chapter 4 of this title.
   B.   All streets shall be improved in accordance with the standards and specifications for street construction as required by the city council. (Ord. 673, sec. 1, 7-17-2000)
   C.   All streets to be surfaced shall be of an overall width in accordance with the standards and specifications for construction as approved by the city council. The portion of the right of way outside the area surfaced shall be sodded or seeded by the developer if deemed necessary by the city engineer. (Ord. 866, sec. 55, 5-17-2010)
   D.   Where required, the curb and gutter shall be constructed in accordance to the standards and specifications for street construction as set forth and approved by the city council.
   E.   The grading and drainage requirements for each plat shall be approved by the city engineer at the expense of the applicant. Every plat presented for final signature shall be accompanied by a report from the city engineer that the grading and drainage requirements have been met. In an area not having municipal storm sewer trunk, the applicant shall be responsible, before platting, to provide for a stormwater disposal plan, without damage to properties outside the platted area, and said stormwater disposal plan shall be submitted to the city engineer, who shall report to the city council on the feasibility of the plan presented. No plat shall be approved before an adequate stormwater disposal plan is presented and approved by the city engineer and city council. The use of dry wells for the purpose of stormwater disposal is prohibited.
   F.   Trees and boulevard sodding shall be planted in conformance with the standards and specifications as required by the city council. (Ord. 673, sec. 1, 7-17-2000)
   G.   Street signs of the design approved by the city council shall be installed. (Ord. 866, sec. 56, 5-17-2010)
   H.   Driveway aprons and sidewalks of standard design or pedestrian pathways as may be required by the city council shall be installed. (Ord. 866, sec. 57, 5-17-2010)
   I.   Street lighting fixtures as may be required by the city council shall be installed 1 . (Ord. 673, sec. 1, 7-17-2000)

 

Notes

1
1. See section 7-3-5 of this code.