§ 153.109  SEWERS.
   (A)   All subdivisions shall be provided with an approved sewage disposal system.
   (B)   Connection with the sanitary sewer system shall be required except where the Town Administrator determines that such connection will require unreasonable methods of sewage disposal. Where septic tanks are to be installed, the subdivider shall conduct soil tests on each lot of the proposed subdivision under the supervision of the Director of Public Works in order to determine the adequacy of proposed lot sizes. If a sanitary sewage disposal system is to be installed, the plans for such system must be approved by Tarrant County Health Department, prior to approval of the final plat by the Commission.
(Ord. 353, passed 7-10-2013)