From and after the effective date of this chapter, the town’s development and inspection fees for developments located inside the town and within its extraterritorial jurisdiction shall be 4% of the construction costs of the water, sewer, street and drainage facilities required by this chapter, as determined by the Town Administrator. Payment shall be made as the construction is incurred or within ten days thereof.
(Ord. 353, passed 7-10-2013)