§ 53.04 WATER SERVICE.
   (A)   Before any connection is made to any water main, application for a permit must be made in writing by the owner or his authorized agent, of the premises to be served, at the office of the Village Clerk. Such application shall be made on forms provided by the village, and shall contain such information and/or agreement as the Village Manager may require.
   (B)   No connection shall be made until the applicant has paid to the village the following permit fees for tapping the main, the installation of the service pipe from the main to the service cock, the service cock and stop box and the furnishing of a meter (which shall remain the property of the village):
 
Water Tap and Meter   
Fee
3/4" tap
$1,800
1" tap
2,000
1-1/2" tap
2,600
2" tap
3,400
greater than 2" tap
4,500 tap fee. The customer is also responsible for making the tap and paying for the meter at cost plus 20% for administration.
 
   (C)   Temporary use of water for construction or other purposes will not be permitted unless suitable protection is provided to prevent damage or freezing of the water meter. All temporary water usage shall be metered and all necessary tap and installation fees shall be paid prior to turn on of water.
   (D)   All water using premises located in the village shall apply for an installation permit and be connected to the water system. Those dwellings that are not connected on the date of enactment of this chapter are excluded.
(Ord. 18.04, passed 10-23-78; Am. Ord. 18.14, passed 6-12-96; Am. Ord. 18.20, passed 3-22-99)