§ 51.53 FAILURE TO CONNECT; NOTICE.
   When the structure in which sanitary sewage originates has not been connected to an available public sanitary sewer system before use and occupancy, or within the 12 months period provided in this subchapter, the village shall require the connection to be made forthwith after notice, which may be by first class or certified mail or posting on the property, to the owner of the property on which the structure is located. The notice shall give the approximate location of the public sanitary sewer of the system which is available for connection of the structure involved and shall advise the owner of the requirements and of the enforcement provisions of this subchapter.
(Ord. 23.05, passed 3-12-73) Penalty, see § 10.99