(A) Authority. The Village Council shall have authority to authorize the design and construction of a storm water system.
(B) Storm water system. The storm water system shall include, but not be limited to, pumping stations, catch basins, pipes and retention ponds.
(C) Tap in fee. All applicants applying for hook-up to the storm water system shall pay a tap in fee to the village. The tap in fee shall be equal to the cost the village incurs in designing and constructing the system. The tap in fee shall include all engineering costs and the cost of all off site improvements.
(Ord. 29.01, passed 4-8-85) Penalty, see § 10.99