Loading...
§ 50.036 APPLICATION.
   For a building sewer permit, the owner or his or her agent shall make application on a special form furnished by the city. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the city. A connection, permit, and inspection fee as periodically established by the city for a residential or commercial building sewer permit or for an industrial building sewer permit shall be paid to the city at the time the application is filed.
(Ord. 118, passed 10-23-80; Am. Ord. 1518, passed 11-6-14)
§ 50.037 INSTALLATION COSTS.
   All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
(Ord. 118, passed 10-23-80; Am. Ord. 1518, passed 11-6-14)
§ 50.038 SEPARATE SEWERS REQUIRED; EXCEPTION.
   A separate and independent building sewer shall be provided for every building. However, where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard, or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer. The city assumes no obligation or responsibility for damage caused by or resulting from any single building sewer which serves two buildings.
(Ord. 118, passed 10-23-80; Am. Ord. 1518, passed 11-6-14) Penalty, see § 10.99
§ 50.039 USE OF OLD SEWERS.
   Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the city, to meet all requirements of this chapter.
(Ord. 118, passed 10-23-80; Am. Ord. 1518, passed 11-6-14) Penalty, see § 10.99
§ 50.040 SPECIFICATIONS.
   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the city building and plumbing codes, or other applicable rules and regulations of the city.
(Ord. 118, passed 10-23-80; Am. Ord. 1518, passed 11-6-14) Penalty, see § 10.99
Loading...