(A) (1) Interim uses and structures may be placed in agricultural, commercial, or industrial districts after obtaining a conditional use permit.
(2) These interim uses may be utilized in a temporary manner as specified by the City Council, during which the development planned for the area in the city plan has not yet occurred.
(Prior Code, Ch. 300 § 728.01)
(B) (1) Interim uses and structures utilized for interim storage of wholesale or retail products or shelter of farm crops and animals shall be limited to a maximum of 5 years or as stipulated by the City Council.
(2) No wholesale or retail sales or sales office activities shall occur on the site or in the structure.
(Prior Code, Ch. 300 § 728.02)
(C) Interim uses and structures shall not require additional public roadway or premature extension of central sewer or water systems.
(Prior Code, Ch. 300 § 728.03)
(D) (1) The City Council may specify the length of time which may be utilized for the interim use or structure.
(2) The specific length of time may be a condition of approval of the conditional use permit.
(Prior Code, Ch. 300 § 728.04)
(E) The Planning Commission and City Council shall review the interim use or structure and shall limit the new structural investment on the site to a specific dollar amount, which through a graduated time table of depreciation of the structure should reach 0 book value at a specific year or length of time, after which the interim use or structure shall be removed.
(Prior Code, Ch. 300 § 728.05)
(F) Grading or alteration of the site, except for driveway access and building construction shall not be permitted for interim uses or structures.
(Prior Code, Ch. 300 § 728.06)
(G) Conditional use permits issued by the City Council for an interim use or structure shall be recorded with the Registrar of Deeds by the applicant prior to the issuance of building permits or certificates of occupancy.
(Prior Code, Ch. 300 § 728.07)