The applicant shall be required to submit certification by a registered professional engineer, registered architect or registered land surveyor that the finished fill and building elevations were accomplished in compliance with the provisions of this chapter. As-built elevations for elevated structures must be certified by ground surveys. The Zoning Administrator shall maintain a record of the elevation of the lowest floor (including basement) for all new structures and alterations or additions to existing structures in the Floodplain District.
(Ord. 197, passed 10-5-1992)