(A) The following is the residential fee schedule.
Type | Building Fee | Minimum Fee | Zoning Fee |
Type | Building Fee | Minimum Fee | Zoning Fee |
New residences | $10 for first $1,000 valuation plus | $300 | $100 |
One- or two-family | $5 for each additional $1,000 valuation | ||
Additions | Same | $100 | $50 |
Remodeling/repair | Same | $100 | $20 |
Garages | Same | $100 | $50 |
Accessory buildings | Same | $100 | $50 |
Sheds up to 120 sq. ft. | $25 flat fee | $25 | |
Mobile home in mobile home park | $100 flat fee | $50 | |
Manufactured homes not in mobile home park | Same as new residence | $300 | $100 |
Decks, patios 8 in. or more above ground | $25 flat fee | $25 | |
Ingrown pools | $100 flat fee | $25 | |
Demolition | $25 flat fee | $25 | |
Moving residence | Same as new residence | $300 | $100 |
Free standing towers 35 ft. high and over | $3 per lineal foot | $150 | $100 |
Satellite dishes | $20 | ||
Fences | $1 per 8-ft. section or fraction thereof | $20 | |
Plus fees for plumbing, electrical, mechanical (See § 151.043) | |||
(B) The following is the residential inspection fee schedule.
Residential Inspection Fees
|
Residential Inspection Fees
| |
Footing: pre-pour inspection | $35 |
Footing inspection | $35 |
Foundation inspection | $35 |
*Underlay mechanicals inspections *HAC, electric, plumbing | $35 each |
Electric service inspections | |
First 200 amps | $40 |
Each additional 100 amps | $20 |
Rough HAC inspection | $35 |
Rough plumbing inspection | $35 |
Rough electric inspection | $35 |
Rough building inspection | $35 |
Final HAC | $35 |
Final plumbing inspection | $35 |
Final electric inspection | $35 |
Final building inspection | $35 |
* Each additional inspection | $35 |
(Prior Code, § 151.035) (Ord. passed 11-2-1970; Ord. 18A-1, passed 6-12-2001)