(A) A layer of suitable cover material at least six inches thick after compaction shall be placed over the daily working face.
(B) The total final cover material shall be at least two feet of compacted cover and six inches of loose top soil.
(C) Final cover shall be placed over any completed section of the fill within seven days following the placement of refuse within that portion.
(Prior Code, § 95.65) (Ord. 26, passed 8-20-1974)