The entire disposal site, including the fill area shall be graded and provided with adequate drainage facilities to:
(A) Minimize storm water runoff onto or into the fill, with a minimum slope of 2% and a maximum slope of 25%;
(B) Prevent erosion or washing of the fill area;
(C) Drain off rain water falling on the fill area; and
(D) Prevent the collection of standing water.
(Prior Code, § 95.56) (Ord. 26, passed 8-20-1974)