§ 51.24 ADDITIONAL RATES AND CHARGES.
   The following rates and charges, for services, in addition to and supplementing those previously described by ordinance, are hereby established.
   (A)   General inspection fee: $100 per inspection.
   (B)   Construction water: $50 per dwelling unit or equivalent thereof.
   (C)   Seasonal, after-hours, or temporary service turn-off/turn-on: $100.
   (D)   Force account work, contract operation and maintenance: $65 per man-hour, regular (4 hour minimum maintenance call out); $100 per man-hour, overtime; plus support equipment.
   (E)   Water meter charges:
 
FY 2023
FY 2024
(1)   Single-unit residential dwelling meter
   5/8 in. meter or 1 in. meter
N/A
$350
(2)   5/8 in. meter (non-residential uses)
$250
$294
(3)   1 in. meter (non-residential uses)
$350
$407
(4)   1-1/2 in. meter
$600
$967
(5)   2 in. meter
$800
$1,267
(6)   3 in. meter
$1,600
$2,101
(7)   4 in. meter
$1,800
$2,240
(8)   6 in. meter
$2,000
$2,553
(9)   Meters over 6 in.
Cost
Cost
 
   (F)   Automatic sprinkler systems:$0.12 per head per month.
   (G)   Septage disposal fee: initial permit $200; annual renewal $100.
   (H)   Septage disposal fee: $40 per 1,000 gallons.
   (I)   Septage decant: $40 per 1,000 gallons.
   (J)   Drying pad fee: $250 per truckload, $150 per sweeper.
   (K)   Hydrant flow test: $250 per hydrant.
   (L)   Laboratory test fees are as follows:
Laboratory Test Fees
Test
LCPW Price
Test
LCPW Price
Water & Waste Water
Alkalinity
12.00
BOD/CBOD
20.00
Chlorine, Residual
15.00
COD
18.00
Chloride
12.00
Conductivity
12.00
Oil & Grease
40.00
Fluoride
12.00
Hardness
12.00
Hexavalent Chromium
18.00
Nitrate
12.00
Nitrite
12.00
Nitrates, Total (NO2+ NO3)
23.00
Nitrogen, Ammonia
12.00
Nitrogen, Total Kjeldahl
25.00
Ortho-Phosphate
15.00
pH
8.00
Phosphorous, Total
18.00
Settleable Solids
12.00
TSS
15.00
TDS
15.00
VS
12.00
VSS
12.00
TS
15.00
Sulfate
15.00
Turbidity
12.00
TOC (aq)
35.00
   Microbiology
Fecal Coliform
18.00
Total Coliform/E. Coli (Colilert)
18.00
Total Coliform/E. Coli (MF)
18.00
HPC
18.00
   Soil, Sludge, Solid Waste
Nitrogen, Ammonia
12.00
   Metals
Boron
15.00
Cadmium
15.00
Chromium, Total
15.00
Copper
15.00
Iron, Total
15.00
Iron, Dissolved
20.00
Lead
15.00
Manganese
15.00
Nickel, Total
15.00
Nickel, Dissolved
20.00
Zinc
15.00
   Metals (GF)
Arsenic
25.00
Cadmium
25.00
Lead
25.00
Molybdenum
25.00
   Metals (ICPMS)
Arsenic
30.00
Barium
30.00
Cadmium
30.00
Chromium, Total
30.00
Copper
30.00
Iron
30.00
Lead
30.00
Manganese
30.00
Molybdenum
30.00
Nickel, Total
30.00
Nickel, Dissolved
35.00
Selenium
30.00
Silver
30.00
Zinc
30.00
   ICPMS Add Ons:
Liquid Digestion
15.00
Nitrogen, Total Kjeldahl
25.00
VS
12.00
TS
15.00
Specific Oxygen Uptake Rate
20.00
Solid Digestion
25.00
   Outside Lab Processing Fee*
Flat Fee
100.00
*Processing fee to cover shipping and time and materials for samples that are sent to outside labs for the testing.
 
   (M)   Installation of outside AMR transmitter: $50 per transmitter.
   (N)   Manual meter reads in lieu of transmitter: $9.33 per month.
   (O)   Grease trap installation: $100.
   (P)   Grease trap inspection: $100.
   (Q)   FOG Discharge License: $100.
   (R)   Pretreatment:
      (1)   Pretreatment permit: $300.
      (2)   Industrial inspection: $65 per hour.
      (3)   Industrial sampling: $65 per hour.
      (4)   Permit renewal: $250.
(1977 Code, §§ 4:2-9, 4:2-9A3) (Ord. 10-0784, passed 8-19-2010; Ord. 11-0425, passed 5-10- 2011; Ord. 12-0232, passed 3-13-2012; Ord. 12-0856, passed 8-14-2012; Ord. 13-0739, passed 7-9-2013; Ord. 13-0850, passed 8-13-2013; Ord. 13-1341, passed 12-10-2013; Ord. 14-0392, passed 5-13-2014; Ord. 14-0581, passed 6-10-2014; Ord. 15-1005, passed 10-13-2015; Ord. 16-0944, passed 10-11-2016; Ord. 18-0871, passed 8-14-2018; Ord. 18-1102, passed 10-9-2018; Ord. 19-1311, passed 8-13-2019; Ord. 19-1743, passed 11-12-2019: Ord. 21-0038, passed 1-12-2021; Ord. 22-0967, passed 7-12-2022; Ord. 23-0906, passed 7-11-2023)