§ 51.24 ADDITIONAL RATES AND CHARGES.
   The following rates and charges, for services, in addition to and supplementing those previously described by ordinance, are hereby established.
   (A)   General inspection fee: $100 per inspection.
   (B)   Construction water: $50 per dwelling unit or equivalent thereof.
   (C)   Seasonal, after-hours, or temporary service turn-off/turn-on: $100.
   (D)   Force account work, contract operation and maintenance: $65 per man-hour, regular (4 hour minimum maintenance call out); $100 per man-hour, overtime; plus support equipment.
   (E)   Water meter charges:*
FY 2024
FY 2025
FY 2024
FY 2025
(1)   Single-unit residential dwelling meter
   (5/8 in. meter or 1 in. meter)
$350
$377
(2)   5/8 in. meter
$294
$313
(3)   1 in. meter
$407
$441
(4)   1-1/2 in. meter
$967
$1,151
(5)   2 in. meter
$1,267
$1,307
(6)   3 in. meter
$2,101
$2,890
(7)   4 in. meter
$2,240
$3,055
(8)   6 in. meter
$2,553
$3,453
(9)   Meters over 6 in.
Cost
Cost
 
   (F)   Automatic sprinkler systems:$0.12 per head per month.
   (G)   Septage disposal fee: initial permit $200; annual renewal $100.
   (H)   Septage disposal fee: $40 per 1,000 gallons.
   (I)   Septage decant: $40 per 1,000 gallons.
   (J)   Drying pad fee: $250 per truckload, $150 per sweeper.
   (K)   Hydrant flow test: $250 per hydrant.
* Water meter charges are pass through from vendor.
   (L)   Laboratory test fees are as follows:
Laboratory Test Fees
Test
FY2024 Price
FY2025 Price
Test
FY2024 Price
FY2025 Price
Water & Waste Water
 
 
Alkalinity
$12.00
$15.00
Biochemical Oxygen Demand (BOD)
$20.00
$25.00
Chlorine, Residual
$15.00
$15.00
Chemical Oxygen Demand (COD)
$18.00
$20.00
Chloride
$12.00
$15.00
Conductivity
$12.00
$12.00
Oil & Grease
$40.00
$50.00
Fluoride
$12.00
$15.00
Hardness*
$12.00
$15.00
Nitrate
$12.00
$18.00
Nitrite
$12.00
$18.00
Nitrogen, Ammonia
$12.00
$15.00
Nitrogen, Total Kjeldahl
$25.00
$35.00
Nitrogen, Total
$25.00
$25.00
Ortho-Phosphate
$15.00
$18.00
pH
$8.00
$10.00
Phosphorous, Total
$18.00
$25.00
Settleable Solids
$12.00
$12.00
Total Suspended Solids (TSS)
$15.00
$18.00
Total Dissolved Solids (TDS)
$15.00
$18.00
Volatile Solids (VS)
$12.00
$18.00
Volatile Suspended Solids (VSS)
$12.00
$18.00
Total Solids (TS)
$15.00
$18.00
Sulfate
$15.00
$18.00
Turbidity
$12.00
$15.00
Total Organic Carbon (TOC)
$35.00
$25.00
Test
FY2024 Price
FY2025 Price
Microbiology
Fecal Coliform
$18.00
$25.00
Total Coliform/E. Coli (Colilert)
$18.00
$25.00
Total Coliform/E. Coli (MF)
$18.00
$25.00
Heterotropic Plate Count (HPC)
$18.00
$25.00
Soil, Sludge, Solid Waste
Nitrogen, Ammonia
$12.00
$15.00
Nitrogen, Total Kjeldahl
$25.00
$35.00
Volatile Solids (VS)
$12.00
$18.00
Total Solids (TS)
$15.00
$18.00
Specific Oxygen Uptake Rate (SOUR)
$20.00
$20.00
Metals
Arsenic
$25.00
$55.00
Barium
$30.00
$55.00
Boron
$15.00
$18.00
Cadmium
$15.00
$55.00
Chromium, Total
$15.00
$55.00
Copper
$15.00
$55.00
Iron
$15.00
$35.00
Lead
$15.00
$55.00
Manganese
$15.00
$55.00
Molybdenum
$25.00
$55.00
Nickel
$15.00
$55.00
Selenium
$30.00
$55.00
Silver
$15.00
$55.00
Zinc
$15.00
$55.00
Lab Processing Fee*
Flat rate
$100.00
$100.00
*Processing fee to cover shipping and time and materials for samples that are sent to outside labs for the testing.
 
   (M)   Installation of outside AMR transmitter: $50 per transmitter.
   (N)   Manual meter reads in lieu of transmitter: $9.33 per month.
   (O)   Grease trap installation: $100.
   (P)   Grease trap inspection: $100.
   (Q)   FOG Discharge License: $100.
   (R)   Non-domestic waste disposal: $40/1,000 gallons.
   (S)   Pretreatment:
      (1)   Pretreatment permit: $300.
      (2)   Industrial inspection: $65 per hour.
      (3)   Industrial sampling: $65 per hour.
      (4)   Permit renewal: $250.
(1977 Code, §§ 4:2-9, 4:2-9A3) (Ord. 10-0784, passed 8-19-2010; Ord. 11-0425, passed 5-10- 2011; Ord. 12-0232, passed 3-13-2012; Ord. 12-0856, passed 8-14-2012; Ord. 13-0739, passed 7-9-2013; Ord. 13-0850, passed 8-13-2013; Ord. 13-1341, passed 12-10-2013; Ord. 14-0392, passed 5-13-2014; Ord. 14-0581, passed 6-10-2014; Ord. 15-1005, passed 10-13-2015; Ord. 16-0944, passed 10-11-2016; Ord. 18-0871, passed 8-14-2018; Ord. 18-1102, passed 10-9-2018; Ord. 19-1311, passed 8-13-2019; Ord. 19-1743, passed 11-12-2019: Ord. 21-0038, passed 1-12-2021; Ord. 22-0967, passed 7-12-2022; Ord. 23-0906, passed 7-11-2023; Ord. 24-0926, passed 8-13-2024)