The following rates and charges, for services, in addition to and supplementing those previously described by ordinance, are hereby established.
(A) General inspection fee: $100 per inspection.
(B) Construction water: $50 per dwelling unit or equivalent thereof.
(C) Seasonal, after-hours, or temporary service turn-off/turn-on: $100.
(D) Force account work, contract operation and maintenance: $65 per man-hour, regular (4 hour minimum maintenance call out); $100 per man-hour, overtime; plus support equipment.
(E) Water meter charges:
FY 2023 | FY 2024 | |
(1) Single-unit residential dwelling meter 5/8 in. meter or 1 in. meter | N/A | $350 |
(2) 5/8 in. meter (non-residential uses) | $250 | $294 |
(3) 1 in. meter (non-residential uses) | $350 | $407 |
(4) 1-1/2 in. meter | $600 | $967 |
(5) 2 in. meter | $800 | $1,267 |
(6) 3 in. meter | $1,600 | $2,101 |
(7) 4 in. meter | $1,800 | $2,240 |
(8) 6 in. meter | $2,000 | $2,553 |
(9) Meters over 6 in. | Cost | Cost |
(F) Automatic sprinkler systems:$0.12 per head per month.
(G) Septage disposal fee: initial permit $200; annual renewal $100.
(H) Septage disposal fee: $40 per 1,000 gallons.
(I) Septage decant: $40 per 1,000 gallons.
(J) Drying pad fee: $250 per truckload, $150 per sweeper.
(K) Hydrant flow test: $250 per hydrant.
(L) Laboratory test fees are as follows:
Laboratory Test Fees
Test | LCPW Price |
Test | LCPW Price |
Water & Waste Water | |
Alkalinity | 12.00 |
BOD/CBOD | 20.00 |
Chlorine, Residual | 15.00 |
COD | 18.00 |
Chloride | 12.00 |
Conductivity | 12.00 |
Oil & Grease | 40.00 |
Fluoride | 12.00 |
Hardness | 12.00 |
Hexavalent Chromium | 18.00 |
Nitrate | 12.00 |
Nitrite | 12.00 |
Nitrates, Total (NO2+ NO3) | 23.00 |
Nitrogen, Ammonia | 12.00 |
Nitrogen, Total Kjeldahl | 25.00 |
Ortho-Phosphate | 15.00 |
pH | 8.00 |
Phosphorous, Total | 18.00 |
Settleable Solids | 12.00 |
TSS | 15.00 |
TDS | 15.00 |
VS | 12.00 |
VSS | 12.00 |
TS | 15.00 |
Sulfate | 15.00 |
Turbidity | 12.00 |
TOC (aq) | 35.00 |
Microbiology | |
Fecal Coliform | 18.00 |
Total Coliform/E. Coli (Colilert) | 18.00 |
Total Coliform/E. Coli (MF) | 18.00 |
HPC | 18.00 |
Soil, Sludge, Solid Waste | |
Nitrogen, Ammonia | 12.00 |
Metals | |
Boron | 15.00 |
Cadmium | 15.00 |
Chromium, Total | 15.00 |
Copper | 15.00 |
Iron, Total | 15.00 |
Iron, Dissolved | 20.00 |
Lead | 15.00 |
Manganese | 15.00 |
Nickel, Total | 15.00 |
Nickel, Dissolved | 20.00 |
Zinc | 15.00 |
Metals (GF) | |
Arsenic | 25.00 |
Cadmium | 25.00 |
Lead | 25.00 |
Molybdenum | 25.00 |
Metals (ICPMS) | |
Arsenic | 30.00 |
Barium | 30.00 |
Cadmium | 30.00 |
Chromium, Total | 30.00 |
Copper | 30.00 |
Iron | 30.00 |
Lead | 30.00 |
Manganese | 30.00 |
Molybdenum | 30.00 |
Nickel, Total | 30.00 |
Nickel, Dissolved | 35.00 |
Selenium | 30.00 |
Silver | 30.00 |
Zinc | 30.00 |
ICPMS Add Ons: | |
Liquid Digestion | 15.00 |
Nitrogen, Total Kjeldahl | 25.00 |
VS | 12.00 |
TS | 15.00 |
Specific Oxygen Uptake Rate | 20.00 |
Solid Digestion | 25.00 |
Outside Lab Processing Fee* | |
Flat Fee | 100.00 |
*Processing fee to cover shipping and time and materials for samples that are sent to outside labs for the testing. | |
(M) Installation of outside AMR transmitter: $50 per transmitter.
(N) Manual meter reads in lieu of transmitter: $9.33 per month.
(O) Grease trap installation: $100.
(P) Grease trap inspection: $100.
(Q) FOG Discharge License: $100.
(R) Pretreatment:
(1) Pretreatment permit: $300.
(2) Industrial inspection: $65 per hour.
(3) Industrial sampling: $65 per hour.
(4) Permit renewal: $250.
(1977 Code, §§ 4:2-9, 4:2-9A3) (Ord. 10-0784, passed 8-19-2010; Ord. 11-0425, passed 5-10- 2011; Ord. 12-0232, passed 3-13-2012; Ord. 12-0856, passed 8-14-2012; Ord. 13-0739, passed 7-9-2013; Ord. 13-0850, passed 8-13-2013; Ord. 13-1341, passed 12-10-2013; Ord. 14-0392, passed 5-13-2014; Ord. 14-0581, passed 6-10-2014; Ord. 15-1005, passed 10-13-2015; Ord. 16-0944, passed 10-11-2016; Ord. 18-0871, passed 8-14-2018; Ord. 18-1102, passed 10-9-2018; Ord. 19-1311, passed 8-13-2019; Ord. 19-1743, passed 11-12-2019: Ord. 21-0038, passed 1-12-2021; Ord. 22-0967, passed 7-12-2022; Ord. 23-0906, passed 7-11-2023)