§ 171.143 FILL PLACEMENT.
   (A)   Minimum requirements. The placement of fill material for onsite wastewater treatment system types 3, 4 and 5 shall be as established in this section.
   (B)   Fill placement. Fill shall be placed in accordance with the approved site plan and shall be placed immediately after site preparation.
   (C)   Storage and transportation. The storage and transportation of fill shall be as specified on the approved site plan; no traffic shall be allowed directly on the plowed area.
   (D)   Filling procedure. Fill shall be placed only from the upslope or ends of the proposed soil treatment area as follows:
      (1)   Using backhoe. Material may be placed with a backhoe reaching into the soil treatment area.
      (2)   Using low compression equipment. Material may be pushed into the soil treatment area by low compression equipment maintaining a minimum of six inches of material beneath the equipment. Rubber tire machinery shall not be used unless approved by the Health Officer.
(Ord. [Bd of Health Ord., Art. V], passed 11-12-1996; Ord. [Bd of Health Ord., Art. V], passed 11-12-2013)